From jbgreen@fnal.gov Thu May 19 13:51:15 2005 Date: Thu, 19 May 2005 08:55:58 -0500 From: Johnny Green To: George Wolf Cc: John Anderson , John Foglesong , Daniel Edmunds , Alan L. Stone Subject: adf transition layout review summary George We had an engineering review last evening of the layout and here are the issues. 1) Schematic error requires revising some trace routing, revised schematic enclosed. 2) Trace routing separation on layers should be more uniform, similar to lower section. 3) Escapes from connector should go farther from final row going horizontal before diagonal. 4) Layer ID's why are they different seems some read from the opposite orientation. Need layer stackup copper features (see-thru indicates stacking order), so that there can be no stack errors. 5) Pressfit connectors should not have thermals on grounds. (J0 and P3) 6) Relief on thermals seem large please check make sure proper size. 7) Ground isolation bar to close to P0 space it to mounting hole below . 8) All layers should be 1oz copper. (I'll make sure to emphasize this on the rfq for mfr) 9) Relieve reference designators farther from connectors to allow easy reading. 10) Top Silk Project title is now "Dzero Run2B L1CalTrig" 11) Top silk card title should be "ADF Transition Card" 12) White block for serial number should be added.. 13) Designers name John Foglesong and Johnny Green should be added. regards -- Johnny Green, Fabrications Coordinator Fermilab PO Box 500 Kirk and Wilson Roads Batavia IL. 60510 ms 357 ph 630 840-3392 fx 630 840-8886