From jbgreen@fnal.gov Fri Jun 10 21:53:53 2005 Date: Fri, 10 Jun 2005 17:26:35 -0500 From: Johnny Green To: Linda Bagby , John Foglesong , John Anderson , Alan L. Stone Subject: status fabrications Linda and Guys 1) I have received 19 of the ATC cards in house, I've given one of them with parts to Bruce for him to deliver them to WH13X for assembly. 2) I have the first patch panel card in my office on the work desk that can be used. I've given the approval for the assembly of the remaining 24. 3) The ATC front panels are being manufactured, I expect them by the 6/24 or 27. 4) Rack panels are being fabricated I expect them to start shipping the week of July 4th. 5) The test card schematic has been designed but I need to finish the mechanical drawings before the layout can begin. Schematics on my work desk`. 6) The test cable for the glenaire can be built, I've given the details to John F. 7) I've had the hardware for the Rack Panels ordered. 8) The cable for L0 RTD has not been ordered still pending your approval. (Linda) 9) There is only 1- HV Selector spare and I have it, please do not install until I have time to document some of the mechanical issues. John thinks we should build 3 more. 10) Bruce ordered the parts for Ken Johns, eg. lugs. LAST I'll be gone until 6/20/2005 see you then. regards -- Johnny Green, Fabrications Coordinator Fermilab PO Box 500 Kirk and Wilson Roads Batavia IL. 60510 ms 357 ph 630 840-3392 fx 630 840-8886