BLS-ADF Transition System
- 2004-11-24: Last report from Mario on the signal testing and impedance matching
(doc,
pdf).
- The report will form the basis of D0 Note 4692:
"Impedance Matching and Frequency Analysis of Old and New Cables for the Run IIb L1 Calorimeter Trigger Upgrade"
- 2004-11-15: Web page documentation of the signal tests, impedance matching and
frequency analysis performed by Mario.
- 2004-11-04: A presentation on the BLS-to-ADF transition system presented by Mario at the
L1CAL upgrade mtg
on the cable & patch panel mock-up and the signal impedance testing
(ppt,
pdf).
- 2004-10-21: A presentation on the BLS-to-ADF transition system prepared for the L1CAL upgrade mtg,
but not given as Mario did not attend
(ppt,
pdf).
- 2004-10-06: Web page documentation of the cable & patch panel mock-up effort
performed by Mario with Rick DeJonghe (UIC undergrad).
- The web page will form the basis of D0 Note 4651:
"Physical Placement of Cables and Patch Panels for the Run IIb L1 Calorimeter Trigger Upgrade"
- 2004-09-23: A presentation on the BLS-to-ADF transition system prepared for the trigger upgrade mtg at the collaboration week,
but not given as the draft was not ready in time
(ppt,
pdf).
- 2004-09-13: Report on the first approach to the cable & patch panel mock-up
(doc,
pdf).
- 2004-09-01: Second report on the signal studies
(doc,
pdf).
- 2004-07-29: First report on the signal studies
(doc,
pdf).
This section was last modified on Tue Jan 25 07:14:56 CST 2005.
|
|
D0 Note 4430 Drafts
- BLS-to-ADF Transition System for the Run IIb L1 Calorimeter Trigger Upgrade
- 2004-11-18: Version 5
(doc,
pdf).
- 2004-09-07: Version 4
(doc,
pdf).
- 2004-07-28: Version 3
(doc,
pdf).
- 2004-05-24: Version 2
(doc,
pdf).
- 2004-04-05: Version 1
(doc,
pdf).
- 2004-09-07: Cable & Channel Spreadsheet
(xls)
This section was last modified on Tue Jan 25 07:14:56 CST 2005.
|
|
|